Back to Search
Start Over
Conceptual Design of an Integrated Autonomous Production Control Model in association with a Prescriptive Maintenance Model (PriMa)
- Source :
- Procedia CIRP
- Publication Year :
- 2019
-
Abstract
- Autonomous production control models facilitate coping with co-occurrent and ever-growing production system complexity. The choice of the appropriate control model and objective function in manufacturing industry depends on several interrelated factors such as machine and process flexibility, plant availability, process stability, resource utilization, environmental and economic sustainability. Numerous theoretical models and approaches for autonomous production control have been proposed. Yet, it is hard to determine the effectiveness of efforts in real-life applications, due to neglecting or incomplete consideration of the aforementioned factors. This paper concentrates on the correlative relation between production planning and control (PPC) and maintenance planning. An integrated approach is presented that establishes the link between autonomous production control and prescriptive maintenance model (PriMa). Traditionally, PPC and maintenance planning are carried out apart from one another. In the light of PriMa, various aspects of data-driven maintenance planning and the missing link with autonomous production control are discussed. To this end, this paper presents a conceptual model, which encompasses three sub-systems, namely i) maintenance system, ii) autonomous production control system, and iii) production planning. The proposed model is intended to reduce planning complexity and at the same time achieve an improved plant availability and resource efficiency.
- Subjects :
- Flexibility (engineering)
0209 industrial biotechnology
Process (engineering)
Computer science
Produktionsplanung- und steuerung PPS
media_common.quotation_subject
Control (management)
Resource efficiency
Instandhaltungsplanung
02 engineering and technology
010501 environmental sciences
Autonomie
01 natural sciences
020901 industrial engineering & automation
Production planning
Conceptual design
Risk analysis (engineering)
Production control
Ressourceneffizienz
Conceptual model
General Earth and Planetary Sciences
0105 earth and related environmental sciences
General Environmental Science
media_common
Subjects
Details
- ISSN :
- 22128271
- Database :
- OpenAIRE
- Journal :
- Procedia CIRP
- Accession number :
- edsair.doi.dedup.....f7083b0ef1f20f97be5aeb2a645ed95e
- Full Text :
- https://doi.org/10.1016/j.procir.2019.01.047