Back to Search Start Over

Applying a Generalized FMEA Framework to an Oil Sands Tailings Dam Closure Plan in Alberta, Canada

Authors :
Renato Macciotta
Nicholas Beier
Haley Schafer
Source :
Minerals; Volume 12; Issue 3; Pages: 293
Publication Year :
2022
Publisher :
MDPI AG, 2022.

Abstract

Historically, tailings facilities have been designed primarily with consideration of the mine’s active life. This is problematic, as the lifespan of a tailings dam may far exceed the life of the mine. Over time, it is expected that these structures will transform into a mine waste structure and then eventually a landform. In Alberta, Canada, dam owners can submit a decommissioning, closure, and abandonment (DCA) plan and completion reports to apply for the facility to be de-registered as a dam. If successful, the structure would be considered a solid waste structure and may be reclassified and regulated as a mine waste dump. The Alberta Energy Regulator expects DCAs to be accompanied and supported by risk assessments that consider long-term physical failure modes, including failure modes that may not be applicable during operations, in accordance with Manual 019. To help support the process of de-registering a tailings dam, a risk management tool, referred to as a Generalized Failure Modes Effects (G-FMEA) framework, was developed and presented in the Journal of Minerals in the Special Issue Tailings Dams: Design, Characterization, Monitoring, and Risk Assessment. The G-FMEA was designed to be used for assessing risks of an external tailings facility in closure, with the goal of assessing the long-term risk of geotechnical failure to support the process of de-registration. In Alberta, a number of tailings dams are undergoing closure and reclamation activities. This paper applies the developed G-FMEA framework to an oil sands tailings dam in Alberta to demonstrate the application of the framework. The paper assesses two specific failure modes of two different elements, including clogging of the drains and surface erosion of the berm. The failure modes are assessed over different timescales to demonstrate how the consequence, likelihood, and risk rating may change over time. The results of this process are discussed in the context of the potential for the facility to be de-registered as a dam.

Details

ISSN :
2075163X
Volume :
12
Database :
OpenAIRE
Journal :
Minerals
Accession number :
edsair.doi.dedup.....f073e7185794455c7e33a5cbae7660fc