Installation management for the European XFEL main accelerator
- Source :
- Journal of physics / Conference Series 874, 012016 (2017). doi:10.1088/1742-6596/874/1/012016, 8th International Particle Accelerator Conference, IPAC2017, Copenhagen, Denmark, 2017-05-14-2017-05-19
- Publication Year :
- 2017
- Publisher :
- IOP Publishing, 2017.
-
Abstract
- 8th International Particle Accelerator Conference, IPAC17, Copenhagen, Denmark, 15 May 2017 - 19 May 2017 ; Journal of physics / Conference Series 874, 012016 (2017). doi:10.1088/1742-6596/874/1/012016<br />By end of 2016, the main accelerator of the European XFEL was completed. To build this complex machine in a minimum of time, certain management methods were introduced in mid 2015, which accelerated the installation process substantially. In the following 64 weeks additional 84 % of the main accelerator were set up. This was possible due to an improved planning, the reinforcement of two teams as well as a permanent controlling and optimizing of the installation process. In this paper, the installation process from July 2015 to end 2016 and the measures which speeded up the workflow are described.<br />Published by IOP Publ., Bristol
Details
- ISSN :
- 17426596 and 17426588
- Volume :
- 874
- Database :
- OpenAIRE
- Journal :
- Journal of Physics: Conference Series
- Accession number :
- edsair.doi.dedup.....dece1d9e5170370050c32cf2f611c903
- Full Text :
- https://doi.org/10.1088/1742-6596/874/1/012016