Back to Search Start Over

CARBON STEEL SS400 FAILURE ANALYSIS OF DUCTING SCRUBBING PIPE AT PT PUSRI PALEMBANG FOR NPK-1 PLANT

Authors :
Pereznasrah
Ozkar F. Homzah
Publication Year :
2023
Publisher :
Zenodo, 2023.

Abstract

The purpose of this research was to discover the various reasons of failures and appropriate repair options for the line ducting cleaning unit system at PT Pusri Palembang's NPK-1 production facility. The main cause of the failures was determined to be a deterioration of the ducting line material caused by corrosion on the inner side of the ducting pipe composed of SS400 carbon steel. We made investigation including an analysis of the thickness of the damaged ducting pipe, as well as a visual check. The investigation showed that the corrosion caused an average drop in pipe wall thickness of up to 70%, according to the findings. The fixed load superimposed on the ducting pipe and the carrying capacity of the piping affect ducting strength, but corrosion on the inner surface of the pipe, caused by direct contact with corrosive and hygroscopic process dust, reduces ducting wall strength against axial and lateral loads. Failure of this ducting pipe caused losses and unscheduled shutdowns of production process, and increased the repair costs also could increase the risk of human accidents. The suggestion as this investigation results is to upgrade the ducting pipe materials to the more corrosion-resistant materials, such as stainless-steel grade SS304. Other suggestion should be taken is also regularly to inspect the ducting cleanness for the internal of ducting and control the dust flow rate through the scrubbing system. As conclusion, the suggestions given are to mitigate the risk of corrosion impact by maintaini­­­­­­ng ducting strength within the minimizing ducting system failures and ensuring the NPK plant's operation reliability.

Details

Database :
OpenAIRE
Accession number :
edsair.doi.dedup.....d7f3014da61ae856071d8ed1ba1ed20c
Full Text :
https://doi.org/10.5281/zenodo.7955418