Optimal Planning of Distribution System Considering Distributed Generators

Authors :
Huishi Liang
Jian Su
Sige Liu
Source :
Applied Mechanics and Materials. :2022-2027
Publication Year :
2013
Publisher :
Trans Tech Publications, Ltd., 2013.

Abstract

This paper presents a methodology for substation optimal planning considering DG for peak shaving. Utility can take effective demand-side management (DSM) to encourage customer-owned DG to participate in peak load shaving, and it can also construct utility DG to meet the peak load demand. In this paper, the impact of DG on peak load shaving is analyzed, and DG is taken as a complement to T&D system to meet load demand, which is considered in the substation planning. Substations sizing and location and new-built utility DG capacity is optimized using Particle Swarm Optimization (PSO), in which supply area of each substation is obtained by Voronoi diagram method. Case study shows that planning result considering DG for peak shaving can defer T&D system expansion so that considerable investment can be saved. Especially for those areas with high cost of T&D system construction, constructing DG to meet peak load demand would be a more economic way.

Details

ISSN :
16627482
Database :
OpenAIRE
Journal :
Applied Mechanics and Materials
Accession number :
edsair.doi.dedup.....cd0fe929892bc7b22f12276341fc06c2
Full Text :
https://doi.org/10.4028/www.scientific.net/amm.291-294.2022