Back to Search Start Over

Commissioning preparation of the AWAKE proton beam line

Authors :
Schmidt, Janet
Biskup, Bartolomej
Bracco, Chiara
Goddard, Brennan
Gorbonosov, Roman
Gourber-Pace, Marine
Gschwendtner, Edda
Jensen, Lars
Jones, Owain Rhodri
Kain, Verena
Mazzoni, Stefano
Meddahi, Malika
Source :
Scopus-Elsevier

Abstract

The AWAKE experiment at CERN will use a proton bunch with an momentum of 400 GeV/c from the SPS to drive large amplitude wakefields in a plasma. This will require a ~830 m long transfer line from the SPS to the experiment. The prepa- rations for the beam commissioning of the AWAKE proton transfer line are presented in this paper. They include the detailed planning of the commissioning steps, controls and beam instrumentation specifications as well as operational tools, which are developed for the steering and monitoring of the beam line. The installation of the transfer line has been finished and first beam is planned in summer 2016.<br />Proceedings of the 7th Int. Particle Accelerator Conf., IPAC2016, Busan, Korea

Details

Database :
OpenAIRE
Journal :
Scopus-Elsevier
Accession number :
edsair.doi.dedup.....cc3261e8474e6982ded6cb6dddab673d