Two-stage stochastic program for disassembly lot-sizing under random ordering lead time
- Source :
- MIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, MIM 2022: 10th IFAC Conference on Manufacturing Modelling, Management and Control, IMT Atlantique, Nantes, Jun 2022, Nantes, France. ⟨10.1016/j.ifacol.2022.09.580⟩
- Publication Year :
- 2022
- Publisher :
- Elsevier BV, 2022.
-
Abstract
- Published in : IFAC-PapersOnLine 55(10):1363-1368. doi :10.1016/j.ifacol.2022.09.580; International audience; This study addresses disassembly lot-sizing that determines the ordering and disassembly schedules of end-of-life (EOL) products and subassemblies to satisfy items demands. A stochastic version with uncertain ordering lead time (OLT) is considered for the first time. Here, OLT represents the time elapsed between placing an order and receiving it (only an EOL product can be ordered). Stochastic integer programming model is developed for the objective of minimizing the expected sum of setup, purchase, inventory and backlog costs. To test the performance of the proposed model, computational experiments were done on various test instances and are reported. The results show that the performance of the proposed model depends on the size of the ordering lead times, the number of periods and components.
Details
- ISSN :
- 24058963
- Volume :
- 55
- Database :
- OpenAIRE
- Journal :
- IFAC-PapersOnLine
- Accession number :
- edsair.doi.dedup.....bf1e080b445d47bba604002227217489