Improvement of the Power Handling Capability of the Upgraded Multi-Frequency ECRH System at ASDEX Upgrade
- Source :
- 2020 45th International Conference on Infrared, Millimeter, and Terahertz Waves (IRMMW-THz)
- Publication Year :
- 2020
-
Abstract
- 8 gyrotrons are in routine operation in the Electron Cyclotron Resonance, !!eating (ECRH) system at the ASDEX Upgrade tokamak. All gyrotrons are step-tunable operating at 105 and 140 GHz with a maximum output power of about 1 MW and 10 s pulse length. The system includes 8 transmission lines, mainly consisting of oversized corrugated waveguides (I.D. = 87 mm) with overall lengths between 50 and 70 meters including quasi-optical sections at both ends. The transmission lines are operating in air and transmission at maximum power levels was limited by arcing in the past. Several measures led to a significant improvement of the power handling capability of the transmission lines.
- Subjects :
- 010302 applied physics
Materials science
Tokamak
Maximum power principle
Nuclear engineering
Pulse duration
01 natural sciences
Electron cyclotron resonance
law.invention
010309 optics
Electricity generation
Electric power transmission
Transmission (telecommunications)
ASDEX Upgrade
law
0103 physical sciences
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Journal :
- 2020 45th International Conference on Infrared, Millimeter, and Terahertz Waves (IRMMW-THz)
- Accession number :
- edsair.doi.dedup.....be51c00b244d2770c39e49ea69b5b486