Back to Search Start Over

The SARAF-LINAC Project 2019 Status

Authors :
Pichoff, Nicolas
Berkovits, Dan
Duperrier, Romuald
Ferrand, Guillaume
Gastineau, Bernard
Gougnaud, Francoise
Jacquemet, Marcel
Luner, Joseph
Madec, Catherine
Perry, Amichay
Piquet, Olivier
Plaisant, Thomas
Reinfeld, Eyal
Senée, Franck
Uriot, Didier
Institut de Recherches sur les lois Fondamentales de l'Univers (IRFU)
Commissariat à l'énergie atomique et aux énergies alternatives (CEA)-Université Paris-Saclay
Publication Year :
2019
Publisher :
HAL CCSD, 2019.

Abstract

SNRC and CEA collaborate to the upgrade of the SARAF accelerator to 5 mA CW 40 MeV deuteron and proton beams (Phase 2). CEA is in charge of the design, construction and commissioning of the MEBT line and the superconducting linac (SARAF-LINAC Project). The prototypes of the 176 MHz NC rebuncher, SC cavities, RF coupler and SC solenoid-Package have been tested recently. Meanwhile, the cryomodules technical specifications have been written and called for tender. This paper presents the status of the SARAF-LINAC Project at April 2019.<br />Proceedings of the 10th Int. Particle Accelerator Conf., IPAC2019, Melbourne, Australia

Details

Language :
English
Database :
OpenAIRE
Accession number :
edsair.doi.dedup.....b152df5e4c5142fd64f428e262d8625a
Full Text :
https://doi.org/10.18429/JACoW-IPAC2019-THPTS116⟩