Back to Search Start Over

Risk Assessment Based On Fuzzy Network (F-ANP) In New Campus Construction Project

Authors :
Yang Jian-ping
Zhou Lin
Source :
Systems Engineering Procedia. 1:162-168
Publication Year :
2011
Publisher :
Elsevier BV, 2011.

Abstract

From the characteristics of New Campus Engineering Project, the paper uses the method of F-ANP to evaluate risks of New Campus Engineering Project by combining the ANP and fuzzy comprehensive evaluation. New Campus Engineering Project belonging to higher risk project is obtained, so as to provide evidence for control the risk of New Campus Engineering Project.

Details

ISSN :
22113819
Volume :
1
Database :
OpenAIRE
Journal :
Systems Engineering Procedia
Accession number :
edsair.doi.dedup.....ad10913b74f77544a69860b9f7b1824e
Full Text :
https://doi.org/10.1016/j.sepro.2011.08.027