Back to Search
Start Over
Conceptual design report for the project to install leak detection in FAST-FT-534/548/549
- Publication Year :
- 1992
- Publisher :
- Office of Scientific and Technical Information (OSTI), 1992.
-
Abstract
- This report provides conceptual designs and design recommendations for installing secondary containment and leak detection systems for three sumps at the Fluorinel and Storage Facility (FAST), CPP-666. The FAST facility is located at the Idaho Chemical Processing Plant (ICPP) at the Idaho National Engineering Laboratory (INEL). The three sumps receive various materials from the FAST water treatment process. This project involves sump upgrades to meet appropriate environmental requirements. The steps include: providing sump modifications or designs for the installation of leak chases and/or leakage accumulation, coating the sump concrete with a chemical resistant sealant (except for sump VES-FT-534 which is already lined with stainless steel) to act as secondary containment, lining the sumps with a primary containment system, and providing a means to detect and remove primary containment leakage that may occur.
Details
- Database :
- OpenAIRE
- Accession number :
- edsair.doi.dedup.....9104801191aebcf0d88affab6ca64b75
- Full Text :
- https://doi.org/10.2172/10171019