Back to Search Start Over

Predictive-reactive Strategy for Flowshop Rescheduling Problem: Minimizing the Total Weighted Waiting Times and Instability

Authors :
Nathalie Sauer
Christophe Sauvey
Ayoub Tighazoui
Laboratoire de Génie Informatique, de Production et de Maintenance (LGIPM)
Université de Lorraine (UL)
Source :
Journal of Systems Science and Systems Engineering, Journal of Systems Science and Systems Engineering, Springer Verlag (Germany), 2021, ⟨10.1007/s11518-021-5490-8⟩
Publication Year :
2021
Publisher :
HAL CCSD, 2021.

Abstract

Due to the fourth revolution experiencing, referred to as Industry 4.0, many production firms are devoted to integrating new technological tools to their manufacturing process. One of them, is rescheduling the tasks on the machines responding to disruptions. While, for static scheduling, the efficiency criteria measure the performance of scheduling systems, in dynamic environments, the stability criteria are also used to assess the impact of jobs deviation. In this paper, a new performance measure is investigated for a flowshop rescheduling problem. This one considers simultaneously the total weighted waiting time as the efficiency criterion, and the total weighted completion time deviation as the stability criterion. This fusion could be a very helpful and significant measure for real life industrial systems. Two disruption types are considered: jobs arrival and jobs cancellation. Thus, a Mixed Integer Linear Programming (MILP) model is developed, as well as an iterative predictive-reactive strategy for dealing with the online part. At last, two heuristic methods are proposed and discussed, in terms of solution quality and computing time.

Details

Language :
English
ISSN :
10043756 and 18619576
Database :
OpenAIRE
Journal :
Journal of Systems Science and Systems Engineering, Journal of Systems Science and Systems Engineering, Springer Verlag (Germany), 2021, ⟨10.1007/s11518-021-5490-8⟩
Accession number :
edsair.doi.dedup.....79fa4663194b77c50c79351853c9f036