Safety Management Plan through Offsite Risk Assessment during Tank Terminal Construction
- Source :
- 대한환경공학회지, Vol 42, Iss 11, Pp 548-557 (2020)
- Publication Year :
- 2020
- Publisher :
- Korean Society of Environmental Engineers, 2020.
-
Abstract
- Objectives : In order to conduct the quantitative risk assessment for hazardous chemical storage facilities at the tank terminal in the port area, the entire risk assessment process was performed in according to the guidances of the Korea Ministry of Environment.Methods : The risk of the facility was derived by the worst-case scenario, alternative scenario, and then evaluated by KORA program. The countermeasures of the risk were suggested by the concept of LOPA.Results and Discussion : Focusing on the worst case scenario and alternative scenario among the scenario having effet to offsite, risk can be reduced to satisfy regulation by applying measures of passive, active, and managerial.Conclusions : According to the result of risk assessment on benzene storage tank and tank lorry when port construction, the amount of storage inside the tank has a significant impact on the offsite. It is necessary to organize the risk of benzene, and comprehensive management of tank terminal storage facilities.
- Subjects :
- tank terminal
risk assessment
02 engineering and technology
Plan (drawing)
010501 environmental sciences
01 natural sciences
lcsh:Environmental engineering
benzene
020401 chemical engineering
Terminal (electronics)
kora
Operations management
lopa
Business
0204 chemical engineering
lcsh:TA170-171
Risk assessment
0105 earth and related environmental sciences
Subjects
Details
- Language :
- English
- ISSN :
- 23837810 and 12255025
- Volume :
- 42
- Issue :
- 11
- Database :
- OpenAIRE
- Journal :
- 대한환경공학회지
- Accession number :
- edsair.doi.dedup.....53a10a1a9463bb609089e3e3461300e6