- Source :
- 2016 IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2016, ISGT Europe
- Publication Year :
- 2016
-
Abstract
- To be able to reach objectives such as peak shaving or self-consumption within smart grids, it becomes increasingly important to control smart grid ready devices within households. This paper explores the planning of devices with minimal run-time constraints and constraints on total cumulative production (e.g., buffer level), such as heat pumps and electric vehicles. For such devices, a novel dynamic programming formulation is presented that makes it possible to find the optimal planning in $\mathcal{O}(N^2)$ time and space, where $N$ is the number of time intervals. To evaluate the algorithm, we integrate it into an existing decentralized demand side management approach. This evaluation shows using simulations that a load curve within a neighborhood can be flattened this way.
- Subjects :
- Demand side
Engineering
Mathematical optimization
business.industry
020209 energy
Control (management)
Optimal planning
02 engineering and technology
Optimal scheduling
Smart Grids
Dynamic programming
Smart grid
IR-103994
Peaking power plant
0202 electrical engineering, electronic engineering, information engineering
Production (economics)
Approaches of management
business
EWI-27790
Subjects
Details
- Database :
- OpenAIRE
- Journal :
- 2016 IEEE PES Innovative Smart Grid Technologies Europe, ISGT Europe 2016, ISGT Europe
- Accession number :
- edsair.doi.dedup.....3eadbf40925d73a3ec76c19f87b2e766