Back to Search
Start Over
The Design, Construction and Operation of the Beam Instrumentation for the High Intensity and Energy Upgrade of ISOLDE at CERN
- Publication Year :
- 2017
-
Abstract
- The High Intensity and Energy (HIE) upgrade to the on-line isotope separation facility (ISOLDE) facility at CERN is currently in the process of being commissioned. The very tight space available between the superconducting acceleration cavities and a challenging specification led to the design of a compact 'diagnostic box' with a number of insertable instruments on a common vacuum chamber. The box was conceived in partnership with the engineering firm AVS and produced as a completed assembly in industry. 14 diagnostic boxes have been installed and are now operational. This paper will describe the design, the construction and first results from operation of these HIE ISOLDE diagnostic boxes.<br />Proceedings of the 5th Int. Beam Instrumentation Conf., IBIC2016, Barcelona, Spain
- Subjects :
- Overview and Commissioning
Accelerators and Storage Rings
Accelerator Physics
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.doi.dedup.....39314879e402e6e967330cdc3c57358f