CDC Compaction at Berth 9 Quay Extension Felixstowe, UK

Authors :
Jeroen Dijkstra
J.W. Vink
Source :
Procedia Engineering. 143:1468-1476
Publication Year :
2016
Publisher :
Elsevier BV, 2016.

Abstract

In February 2015 Cofra Dynamic Compaction (CDC), a heavy Rapid Impact Compaction (RIC) technique to compact granular subsoil, was performed on the Berth 9 Quay Extension project in Felixstowe, UK. The extension consists of a 15.000m2 reclamation between sheet pile walls. The compaction of the reclamation was required to reduce future settlements and improve the properties of the sand behind the quay wall. An extensive compaction trial was performed before the start of the project to assess the compaction procedures and work method in relation to the specifications but also to assess the impact of the compaction on the Quay wall. Compaction effort was monitored during compaction with the use of the crane monitoring system which registers the (induced) settlement with increasing blows. The effect of the compaction has been measured with the use of pre- and post-compaction CPT's. The main quay wall displacements were continuously monitored by a manual station and a robotic total station. During the trial an inclinometer was used to gather more data. The paper focusses on the gathered data, findings and observations during the project and the compaction trials.

Details

ISSN :
18777058
Volume :
143
Database :
OpenAIRE
Journal :
Procedia Engineering
Accession number :
edsair.doi.dedup.....3838c05cf7e902bbf6cdbc937084e30b
Full Text :
https://doi.org/10.1016/j.proeng.2016.06.173