Back to Search Start Over

Design and Implementation of the Array Logging Tool on Horizontal Production Logging

Authors :
Wenguang Song
Haiyu Chen
Qiujuan Zhang
Jiahao Zhang
Source :
Mathematical Problems in Engineering, Vol 2020 (2020)
Publication Year :
2020
Publisher :
Hindawi, 2020.

Abstract

The measuring instruments have some errors in the measurement of high water cut production wells, and many domestic oil fields are also in high water cut state. The measured data from the conventional production logging instrument are all almost inaccurate. This project has designed a staggered probe array flow meter well logging apparatus based on the characteristic of electromagnetic wave specific retention meter that can fully cover the wellbore fluid and improve flow measurement accuracy. According to the application in horizontal wells, the accuracy of this measuring instrument now has been proved to be more than 90% and can meet the requirements of production logging interpretation in horizontal wells.

Details

Language :
English
ISSN :
1024123X
Database :
OpenAIRE
Journal :
Mathematical Problems in Engineering
Accession number :
edsair.doi.dedup.....33c9ecd73eea4223b873dae596ba2f88
Full Text :
https://doi.org/10.1155/2020/6903970