Back to Search Start Over

Recent achievements on tests of series gyrotrons for W7-X and planned extension at the KIT gyrotron test facility

Authors :
Günter Dammertz
F. Legrand
Stefan Illy
Tomasz Rzesnicki
Andreas Schlaich
V. Erckmann
Andrey Samartsev
Gerd Gantenbein
Amitavo Roy Choudhury
Martin Schmid
Manfred Thumm
John Jelonnek
Stefan Kern
Source :
Fusion Engineering and Design, Fusion Engineering and Design, v.88, 945-949 (2013)
Publication Year :
2013
Publisher :
Elsevier BV, 2013.

Abstract

Parasitic beam tunnel oscillations have been hampering the series production of gyrotrons for W7-X. This problem has now been overcome thanks to the introduction of a specially corrugated beam tunnel. Two gyrotrons equipped with the new beam tunnel have fully passed the acceptance tests. Despite excellent power capability, the expected efficiency has not yet been achieved, possibly due to the presence of parasitic oscillations suspected to be dynamic after-cavity-oscillations (ACI's) or due to insufficient electron beam quality. Both theoretical and experimental investigations on these topics are ongoing. On previous W7-X gyrotrons collector fatigue has been observed, not (yet) leading to any failures so far. The plastic deformation occurring on the collector has now been eliminated due to the strict use (on all gyrotrons) of a sweeping method which combines the conventional 7 Hz solenoid sweeping technique with a 50 Hz transverse-field sweep system. Starting in 2013, the gyrotron test facility at KIT will be enhanced, chiefly with a new 10 MW DC modulator, capable of testing gyrotrons up to 4 MW CW output power with multi-stage-depressed collectors.

Details

ISSN :
09203796
Volume :
88
Database :
OpenAIRE
Journal :
Fusion Engineering and Design
Accession number :
edsair.doi.dedup.....2b244e994c099fa1a07438189d1bf64e