Back to Search Start Over

Phase II exponential charts for monitoring time between events data: performance analysis using exact conditional average time to signal distribution

Authors :
Subha Chakraborti
Nirpeksh Kumar
Philippe Castagliola
Banaras Hindu University [Varanasi] (BHU)
University of Alabama [Tuscaloosa] (UA)
Conception, Pilotage, Surveillance et Supervision des systèmes (LS2N - équipe CPS3)
Laboratoire des Sciences du Numérique de Nantes (LS2N)
Institut National de Recherche en Informatique et en Automatique (Inria)-Centre National de la Recherche Scientifique (CNRS)-IMT Atlantique (IMT Atlantique)
Institut Mines-Télécom [Paris] (IMT)-Institut Mines-Télécom [Paris] (IMT)-École Centrale de Nantes (Nantes Univ - ECN)
Nantes Université (Nantes Univ)-Nantes Université (Nantes Univ)-Nantes université - UFR des Sciences et des Techniques (Nantes univ - UFR ST)
Nantes Université - pôle Sciences et technologie
Nantes Université (Nantes Univ)-Nantes Université (Nantes Univ)-Nantes Université - pôle Sciences et technologie
Nantes Université (Nantes Univ)-Institut National de Recherche en Informatique et en Automatique (Inria)-Centre National de la Recherche Scientifique (CNRS)-IMT Atlantique (IMT Atlantique)
Nantes Université (Nantes Univ)
Source :
Journal of Statistical Computation and Simulation, Journal of Statistical Computation and Simulation, 2022, 92 (7), pp.1457-1486. ⟨10.1080/00949655.2021.1998501⟩
Publication Year :
2021
Publisher :
Informa UK Limited, 2021.

Abstract

International audience; In this paper, we study the performance properties of the phase II exponential chart with an unknown in-control (IC) rate parameter, used to monitor high-yield processes. The average time to signal (ATS) is used as the chart performance criterion instead of the usual average run length (ARL). Based on the IC conditional ATS (CATS) distribution, we examine the properties of both the equal-tailed and the ATS-unbiased exponential charts with estimated control limits and adjust the limits so that a nominal IC ATS performance is achieved. Two perspectives are investigated: the unconditional, under which the average of IC CATS distribution is set equal to a nominal ATS and, the conditional so that the IC CATS is set to or exceed a nominal ATS with a high probability. It is shown that the ATS-unbiased exponential chart under the conditional perspective has a better IC performance.

Details

ISSN :
15635163 and 00949655
Volume :
92
Database :
OpenAIRE
Journal :
Journal of Statistical Computation and Simulation
Accession number :
edsair.doi.dedup.....12af8721c4caa7b8546c00629641ba06