Back to Search
Start Over
D4.1 Initial report on test-plan creation and methodology, and development of test orchestration framework
- Publication Year :
- 2019
- Publisher :
- Zenodo, 2019.
-
Abstract
- WP4 is focused on ensuring that the 5G-VINNI facility delivered by the project is verified with a uniform testing procedure, allowing the Mobile Network Operators that are part of the consortium to have confidence in the system. The focus of WP4 is on testing methodology, test execution and E2E network validation to verify that KPIs across different verticals are met. The WP is intended to provide all the needed testing and validation tools and support across the project, as well as providing the support needed by vertical projects hosted by the 5G-VINNI facility. This document is structured as a report on the different activities of the Tasks T4.1 and T4.2 carried out during the first Period, while the Annexes represent the initial structure of a live document that will become, at the end of the project, with D4.4 the official Test Specification handbook of the 5G-VINNI project.
Details
- Database :
- OpenAIRE
- Accession number :
- edsair.doi.dedup.....117264cfe814c5ab2c093d00f9d8e9a3
- Full Text :
- https://doi.org/10.5281/zenodo.3345626