Back to Search
Start Over
Optimization of Clean Room Infrastructure and Procedure During LCLS-II Cryomodule Production at Fermilab
- Source :
- 19th International Conference on RF Superconductivity (SRF 2019), 19th International Conference on RF Superconductivity (SRF 2019), Jun 2019, Dresden, Germany. pp.TUP096, ⟨10.18429/JACoW-SRF2019-TUP096⟩, 19th International Conference on RF Superconductivity (SRF 2019), Jun 2019, Dresden, Germany. pp.695-697, ⟨10.18429/JACoW-SRF2019-TUP096⟩
- Publication Year :
- 2019
- Publisher :
- HAL CCSD, 2019.
-
Abstract
- Optimization of Fermilab string assembly procedure and infrastructure has yielded a significant improvement of cryomodule particulate counts. Late production of LCLS-II cryomodules were tested at CMTF at Fermilab and showed little to no x-ray up to administrative limit. The paper describes the field emission measurement instrumentation, field emission results of LCLS-II cyomodules, clean room infrastructure upgrade and procedure optimization.<br />Proceedings of the 19th International Conference on RF Superconductivity, SRF2019, Dresden, Germany
Details
- Language :
- English
- Database :
- OpenAIRE
- Journal :
- 19th International Conference on RF Superconductivity (SRF 2019), 19th International Conference on RF Superconductivity (SRF 2019), Jun 2019, Dresden, Germany. pp.TUP096, ⟨10.18429/JACoW-SRF2019-TUP096⟩, 19th International Conference on RF Superconductivity (SRF 2019), Jun 2019, Dresden, Germany. pp.695-697, ⟨10.18429/JACoW-SRF2019-TUP096⟩
- Accession number :
- edsair.doi.dedup.....0dfff0b628f27c4f5411aeb46f36aefd
- Full Text :
- https://doi.org/10.18429/JACoW-SRF2019-TUP096⟩