Back to Search Start Over

RF control hardware design for CYCIAE-100 cyclotron

Authors :
Xing Jiansheng
Zhang Tianjue
Zhao Zhenlu
Chuan Wang
Li Pengzhan
Bin Ji
Xiaoliang Fu
Wei Junyi
Zhiguo Yin
Source :
Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment. 801:104-107
Publication Year :
2015
Publisher :
Elsevier BV, 2015.

Abstract

The Beijing Radioactive Ion-beam Facility project is being constructed by BRIF division of China Institute of Atomic Energy. In this project, a 100 MeV high intensity compact proton cyclotron is built for multiple applications. The first successful beam extraction of CYCIAE-100 cyclotron was done in the middle of 2014. The extracted proton beam energy is 100 MeV and the beam current is more than 20 μA. The RF system of the CYCIAE-100 cyclotron includes two half-wavelength cavities, two 100 kW tetrode amplifiers and power transmission line systems (all above are independent from each other) and two sets of Low Level RF control crates. Each set of LLRF control includes an amplitude control unit, a tuning control unit, a phase control unit, a local Digital Signal Process control unit and an Advanced RISC Machines based EPICS IOC unit. These two identical LLRF control crates share one common reference clock and take advantages of modern digital technologies (e.g. DSP and Direct Digital Synthesizer) to achieve closed loop voltage and phase regulations of the dee-voltage. In the beam commission, the measured dee-voltage stability of RF system is better than 0.1% and phase stability is better than 0.03°. The hardware design of the LLRF system will be reviewed in this paper.

Details

ISSN :
01689002
Volume :
801
Database :
OpenAIRE
Journal :
Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment
Accession number :
edsair.doi...........faecbcbe745fd54e53754f77544e077c