Back to Search
Start Over
Understanding Biases in Pre-Construction Estimates
- Source :
- Journal of Physics: Conference Series. 1037:062009
- Publication Year :
- 2018
- Publisher :
- IOP Publishing, 2018.
-
Abstract
- The pre-construction energy generation of a wind farm (P50) is difficult to estimate and evaluate. This paper presents a methodology to measure the accuracy of the p50 prediction, which we call the Historical Validation Survey (HVS), for several wind farms in the continental United States. Our results indicate that there is a bias between predicted and measured energy, even when controlling for factors like grid curtailment and resource variability. We also find that our results depend on the assumptions we make during analysis, which we quantify with a sensitivity analysis. This method allows the estimation of uncertainty we have in our findings. When we account for reasonable ranges of model assumptions, we find that, in the most optimistic case, there is still a bulk −5.5% bias when estimating pre-construction energy generation. When controlling for grid curtailment this number reduces to a range of −3.5 to −4.5%.
- Subjects :
- Estimation
History
Measure (data warehouse)
010504 meteorology & atmospheric sciences
Computer science
010502 geochemistry & geophysics
Grid
01 natural sciences
Computer Science Applications
Education
Resource (project management)
Electricity generation
Econometrics
Range (statistics)
Sensitivity (control systems)
Energy (signal processing)
0105 earth and related environmental sciences
Subjects
Details
- ISSN :
- 17426596 and 17426588
- Volume :
- 1037
- Database :
- OpenAIRE
- Journal :
- Journal of Physics: Conference Series
- Accession number :
- edsair.doi...........f19290aa50fd10f90ad10136d5d458a2