Back to Search Start Over

Commissioning of the PLS-II

Authors :
S Shin
S Kwon
D-T Kim
D-E Kim
M Kim
S-H Kim
S-C Kim
J Kim
C Kim
B Park
S-S Park
S-J Park
E Park
Y Son
J Yoon
B Lee
E Lee
J-W Lee
H-S Lee
Y Joo
J Choi
T Ha
W Hwang
I Hwang
J-Y Lee
B Oh
C-H Lee
J-Y Kim
J Y Hwang
S H Nam
M Cho
Source :
Journal of Instrumentation. 8:P01019-P01019
Publication Year :
2013
Publisher :
IOP Publishing, 2013.

Abstract

After 14 years of successful operation, the Pohang Light Source (PLS) has completed PLS-II upgrade to meet the increasing demand from the growing user community. The PLS-II upgrade has increased the beam energy from 2.5 GeV to 3 GeV; the number of insertion devices has been increased by a factor of two (20 IDs); and the beam current has been increased to 400 mA from 200 mA. The beam emittance has been reduced to below 10 nm while retaining the existing PLS tunnel as well as the existing injection system. During the six months of commissioning in the latter half of 2011, we have successfully achieved 14 insertion device operations and top-up operations with 100 mA beam current and 5.8 nm beam emittance. In this paper, we report the experimental results obtained from the PLS-II commissioning.

Details

ISSN :
17480221
Volume :
8
Database :
OpenAIRE
Journal :
Journal of Instrumentation
Accession number :
edsair.doi...........eed44ee3e5b4c230441087309da48ec0
Full Text :
https://doi.org/10.1088/1748-0221/8/01/p01019