Progress on reliability of remote maintenance concept for JA DEMO

Authors :
Nobuyuki Asakura
Yoshiteru Sakamoto
Joint Special Design Team for Fusion Demo
Youji Someya
Shinsuke Tokunaga
Ryoji Hiwatari
Kenji Tobita
H. Utoh
Satoshi Kakudate
Source :
Fusion Engineering and Design. 146:1583-1586
Publication Year :
2019
Publisher :
Elsevier BV, 2019.

Abstract

JA DEMO selected the vertical maintenance scheme as the primary maintenance option. In order to improve reliability of Remote Handling (RH) and plant availability, update of in-vessel transferring mechanism of the segment, pipe unit structure on maintenance port were carried out. The RH equipment is composed of end-effectors (grippers) for the banana segment, a power manipulator, a telescopic guide and a carrier. The pipe structure in vertical maintenance port was updated considering the thermal expansion, easy handling (short maintenance time) and alignment of welding groove. Based on estimation of maintenance time, four works in parallel will be required for plant availability reachable for commercialization (>60%).

Details

ISSN :
09203796
Volume :
146
Database :
OpenAIRE
Journal :
Fusion Engineering and Design
Accession number :
edsair.doi...........eb239e4d30ef5056aceaafc59303ea26
Full Text :
https://doi.org/10.1016/j.fusengdes.2019.02.133