Back to Search
Start Over
Closeout of IE Bulletin 79-17: Pipe cracks in stagnant borated water systems at PWR (pressurized water reactors) plants
- Publication Year :
- 1990
- Publisher :
- Office of Scientific and Technical Information (OSTI), 1990.
-
Abstract
- Documentation is provided in this report for the closeout of IE Bulletin 79-17 and its revision on the safety-related subject of pipe cracks in stagnant borated water systems at operating plants with pressurized water reactors (PWRs). Closeout is based on the implementation and verification of actions required by the bulletin. Evaluation of utility responses and NRC/Region inspection reports indicates that the bulletin is closed for all of the 41 operating PWRs to which it was issued for action. It is concluded that the concerns of the bulletin have been resolved. Background information is supplied in the Introduction and Appendix A.
Details
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........da62c5860eb212b2633e4b7c01cfa40a
- Full Text :
- https://doi.org/10.2172/7156744