Back to Search Start Over

The performance of rolling production schedules in a process industry

Authors :
Monique Guignard
Renato de Matta
Source :
IIE Transactions. 27:564-573
Publication Year :
1995
Publisher :
Informa UK Limited, 1995.

Abstract

In this paper we study lot-sizing and changeover decisions in production schedules that are implemented on a rolling-horizon basis. The study is carried out by comparing production schedules for the packaging operations of a pharmaceutical company that produces various products on several capacitated production lines. The schedules are obtained by solving a mixed-integer programming formulation by using a heuristic procedure. We examine the effects of the number of periods in the planning horizon, the starting inventory and the demand fluctuation on the schedules. We show empirically that the saving in annual production cost diminishes rapidly as more demand periods are added to the planning horizon. Computational results are reported.

Details

ISSN :
15458830 and 0740817X
Volume :
27
Database :
OpenAIRE
Journal :
IIE Transactions
Accession number :
edsair.doi...........d63d326e4fc0bc2df555fb2d05592398
Full Text :
https://doi.org/10.1080/07408179508936772