Abstract
- As agencies continue looking for cost-effective methods to rehabilitate deteriorated jointed concrete pavement (JCP), rubblization using a resonant breaker has been experimented by the Shanghai Municipal Roadway Authority (SMRA). It was demonstrated that rubblization using a resonant breaker offers a viable option for the SMRA because the rubblized pavement sections have been performing very well with no visible distress. Based on field observation for a typical hot mix asphalt concrete (HMAC) overlay on a nonrubblized JCP, it was found the treatment normally would have reflective cracking for the same overlay thickness in the first three years. Besides the cost advantage over the reconstruction, a resonant breaker also had yielded the minimum disturbance during the rubblization. It was observed that it was very effective to use water during compaction on a rubblized JCP surface to improve compaction efficiency and to control dust. Furthermore, there is no need to apply a prime coat before the HMAC overlay, as there was no detrimental effect that could be identified. The average rubblized JCP moduli were found to be 1,323 to 1,375 MPa, which are within the range reported in the literature. It was believed that there were high possibilities to increase rubblized JCP moduli without sacrificing the performance by increasing the particle size, because a reduction of 200 mm of HMAC was observed when rubblized JCP increased from 345 to 3,445 MPa at a subgrade modulus of 138 MPa and traffic of 30 million ESAL. However, further research is needed to optimize the rubblized JCP moduli in an attempt to reduce overlay thickness without creating reflective cracking.
- Subjects :
- Engineering
business.industry
Compaction
Pavement maintenance
Building and Construction
Structural engineering
Overlay
Field observation
Cracking
Asphalt pavement
Subgrade modulus
Geotechnical engineering
Comminution
Safety, Risk, Reliability and Quality
business
Civil and Structural Engineering
Subjects
Details
- ISSN :
- 19435509 and 08873828
- Volume :
- 22
- Database :
- OpenAIRE
- Journal :
- Journal of Performance of Constructed Facilities
- Accession number :
- edsair.doi...........d2910419a348933e518c33e6c9bef618
- Full Text :
- https://doi.org/10.1061/(asce)0887-3828(2008)22:6(398)