To meet increased demand for electricity due to growth, SRP plans to construct an approximately 20-mile (mi), double-circuit, 230-kilovolt (kV) transmission line including associated tubular steel pole structures that average 110–140 feet (ft) tall (Project). The Project would connect three 230/69kV receiving stations, including the Ball Substation in Gilbert, the Pfister Substation in southeastern Queen Creek, and the Abel Substation east of San Tan Valley. This Project was approved by the Arizona Corporation Commission (ACC) in 2009, when they issued a Certificate of Environmental Compatibility (CEC) (Decision No. 71441)

Details

Language :
English
Database :
OpenAIRE
Accession number :
edsair.doi...........d06783c0622e6a51b3cf522a4770261d
Full Text :
https://doi.org/10.48512/xcv8475244