Back to Search Start Over

Commissioning Update on RF Station #5 of AWA

Authors :
Liu, Wanming
Conde, Manoel
Doran, Darrell
Ha, Gwanghui
Jing, Chunguang
Power, John
Shao, Jiahang
Whiteford, Charles
Wisniewski, Eric
Publication Year :
2019
Publisher :
JACoW Publishing, Geneva, Switzerland, 2019.

Abstract

The RF system of Argonne Wakefield Accelerator (AWA) facility has grown over the years from one RF power station into 4 RF power stations. The demand for RF power keeps growing as the capability of AWA continues to grow. Now the 5th RF station is needed to fulfill the RF power needs of AWA facility. Some details regarding the construction and commissioning of the 5th RF station of AWA facility are documented in this paper.<br />Proceedings of the North American Particle Accelerator Conference, NAPAC2019, Lansing, MI, USA

Details

Language :
English
Database :
OpenAIRE
Accession number :
edsair.doi...........cdaa62fa5c9e6f1d3eab3b66bd86aa79
Full Text :
https://doi.org/10.18429/jacow-napac2019-tuple08