Back to Search Start Over

Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing

Authors :
Sawarni Hasibuan
Lucky Setiawan
Source :
Quality Innovation Prosperity. 25:19-36
Publication Year :
2021
Publisher :
Technical University of Kosice, Faculty of Materials, Metallurgy and Recycling, 2021.

Abstract

Purpose: The research aims to design a performance improvement framework for a new model of sports shoes to increase the ramp-up process time. Methodology/Approach: The approach used the problem-solving system of 8 disciplines, Single Minute Exchange Dies, Visual Management, and the Just In Time principle. Findings: By using the methods described above, the research findings will have a positive impact on the company. Model changeover time was reduced from 600 minutes to 102 minutes, and ramp-up time was reduced from 20 days to 2 days. Research Limitation/Implication: The limitation of this study was that only the CK2946 model was still done as a case study. The cost and other inhibiting factors were also not included in the discussion of this rump-up process. Originality/Value of paper: By integrating SMED, Just In Time, visual management, and using 8-Dicipline, the researcher developed a framework for improved performance for ramping up a new model of sports shoes.

Details

ISSN :
1338984X and 13351745
Volume :
25
Database :
OpenAIRE
Journal :
Quality Innovation Prosperity
Accession number :
edsair.doi...........cc70a0fd86eae4360783377dbc859b6a