City gas distribution projects delay in India: a critical assessment of risks

Authors :
T. Joji Rao
Atul Rawat
Sumeet Gupta
Source :
International Journal of Energy Sector Management. 15:1163-1180
Publication Year :
2021
Publisher :
Emerald, 2021.

Abstract

Purpose This study aims to identify and rank the operational and financial risks causing a delay in the commencement of the city gas distribution project in India. Design/methodology/approach This study reviews the literature to identify operational and financial risks variables associated with infrastructure projects. Followed by a survey to isolate and assess the critical risk factors for city gas distribution network project in India. The survey data is evaluated using factor analysis to understand the latent structure of the critical risk factors. Second, the author ranks the identified variables as per significance by using the mean score method. Findings Five critical risk factors with 20 variables were extracted and assessed to build more understanding of their significance and impact on city gas distribution network project. Originality/value This study is the first attempt to follow the management approach to identify and rank operational and financial risks impacting city gas distribution project.

Details

ISSN :
17506220
Volume :
15
Database :
OpenAIRE
Journal :
International Journal of Energy Sector Management
Accession number :
edsair.doi...........c74fe01320ed67b6dc4279f3189c8666
Full Text :
https://doi.org/10.1108/ijesm-09-2020-0005