Back to Search Start Over

The LIL facility quadruplet commissioning

Authors :
M. Luttmann
E. Bordenave
T. Chies
Christophe Feral
G. Thiell
B. Le Garrec
Eric Journot
X. Julien
Mélanie Mangeant
T. Lonjaret
O. Lutz
H. Graillot
J.M. Di-Nicola
N. Fleurot
G. Behar
F. Jequier
Source :
Journal de Physique IV (Proceedings). 133:595-600
Publication Year :
2006
Publisher :
EDP Sciences, 2006.

Abstract

Following LIL single beamline commissioning in 2003, where performance in terms of power and energy required for LMJ was demonstrated, we spent year 2004 to qualify the quadruplet (or quad) performance at 1ω/3ω. Over that year, the first quad high power and high energy laser experiments took place on LIL facility. A careful set of test campaigns were conducted to safely ramp up laser performance. The main goal was to measure quad-specific features such as beam synchronization and focal spot (size, smoothing contrast ratio or irradiation nonuniformity σ rms ) versus the LMJ requirements. LIL Quad beam waist was recorded for various pulse durations, smoothing techniques and for a wide range of laser intensities up to LMJ-nominal ones. Now, LIL quad has been commissioned to the center of the target chamber and the first plasma experiments are made.

Details

ISSN :
17647177 and 11554339
Volume :
133
Database :
OpenAIRE
Journal :
Journal de Physique IV (Proceedings)
Accession number :
edsair.doi...........c3e12935194fe412bfb00f0e40328f58
Full Text :
https://doi.org/10.1051/jp4:2006133119