Back to Search
Start Over
Methodological aspects of investment and construction project management in road construction
- Publication Year :
- 2020
- Publisher :
- СанкÑ-ÐеÑеÑбÑÑгÑкий полиÑÐµÑ Ð½Ð¸ÑеÑкий ÑнивеÑÑиÑÐµÑ ÐеÑÑа Ðеликого, 2020.
-
Abstract
- РабоÑа поÑвÑÑена ÑазÑабоÑке модели ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ Ð¸Ð½Ð²ÐµÑÑиÑионно-ÑÑÑоиÑелÑнÑми ÑиÑками в доÑожном ÑÑÑоиÑелÑÑÑве, Ð´Ð»Ñ Ð¿Ð¾Ð²ÑÑÐµÐ½Ð¸Ñ ÑÑÑекÑивноÑÑи пÑоекÑов. Ð¦ÐµÐ»Ñ Ð¸ÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ â ÑазÑабоÑка меÑодиÑеÑÐºÐ¸Ñ Ð°ÑпекÑов и Ð¼ÐµÑ Ð°Ð½Ð¸Ð·Ð¼Ð¾Ð² ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ Ð¿ÑоекÑами в доÑожном ÑÑÑоиÑелÑÑÑве, Ð´Ð»Ñ Ð¼Ð¸Ð½Ð¸Ð¼Ð¸Ð·Ð°Ñии ÑиÑков на ÑÑадии ÑÑÑоиÑелÑÑÑва. ÐбÑекÑом иÑÑÐ»ÐµÐ´Ð¾Ð²Ð°Ð½Ð¸Ñ ÑвлÑеÑÑÑ Ð¸Ð½Ð²ÐµÑÑиÑионно-ÑÑÑоиÑелÑнÑй пÑÐ¾ÐµÐºÑ Ð² доÑожном ÑÑÑоиÑелÑÑÑве, пÑедмеÑом ÑвлÑеÑÑÑ Ð¼ÐµÑодиÑеÑкие аÑпекÑÑ ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ Ñ ÑÑеÑом ÑиÑков. ÐÑи вÑполнении ÑабоÑÑ ÑеÑалиÑÑ ÑледÑÑÑие задаÑи: 1. Ðнализ ÑиÑков пÑиÑÑÑÐ¸Ñ Ð¸Ð½Ð²ÐµÑÑиÑионно-ÑÑÑоиÑелÑнÑм пÑоекÑам на ÑазнÑÑ ÑÑадиÑÑ Ð¶Ð¸Ð·Ð½ÐµÐ½Ð½Ð¾Ð³Ð¾ Ñикла пÑоекÑа. 2. Ðнализ и ÑинÑез ÑÑÑеÑÑвÑÑÑÐ¸Ñ Ð¼ÐµÑодик ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ Ð¸Ð½Ð²ÐµÑÑиÑионнÑми ÑиÑками в доÑожном ÑÑÑоиÑелÑÑÑве. 3. ÐпÑеделение клÑÑевÑÑ Ð¼Ð¾Ð¼ÐµÐ½Ñов меÑодов каÑеÑÑвенного и колиÑеÑÑвенного анализа. 4. ÐÑедложение меÑодики оÑенки инвеÑÑиÑионнÑÑ ÑиÑков в доÑожном ÑÑÑоиÑелÑÑÑве. 5. РазÑабоÑка модели ÑаÑпÑÐµÐ´ÐµÐ»ÐµÐ½Ð¸Ñ Ð¾Ð±Ñемов инвеÑÑиÑий по меÑопÑиÑ-ÑиÑм Ð´Ð»Ñ ÑменÑÑÐµÐ½Ð¸Ñ Ð¿Ð¾ÐºÐ°Ð·Ð°Ð½Ð¸Ð¹ ÑиÑка в доÑожном ÑÑÑоиÑелÑÑÑве. Ð ÑезÑлÑÑаÑе вÑÐ¿Ð¾Ð»Ð½ÐµÐ½Ð¸Ñ Ð¼Ð°Ð³Ð¸ÑÑеÑÑкой диÑÑеÑÑаÑии бÑл пÑоведен анализ ÑеоÑии и пÑакÑики ÑпÑÐ°Ð²Ð»ÐµÐ½Ð¸Ñ ÑиÑками пÑи пÑоекÑиÑовании, ÑÑÑоиÑелÑÑÑве и ÑкÑплÑаÑаÑии авÑомобилÑнÑÑ Ð´Ð¾Ñог и пÑедложена меÑодика оÑенки инвеÑÑиÑионнÑÑ ÑиÑков в доÑожном ÑÑÑоиÑелÑÑÑве. РазÑабоÑана Ð¼Ð¾Ð´ÐµÐ»Ñ ÑаÑпÑÐµÐ´ÐµÐ»ÐµÐ½Ð¸Ñ Ð¾Ð±Ñемов инвеÑÑиÑий по меÑопÑиÑÑиÑм Ð´Ð»Ñ ÑменÑÑÐµÐ½Ð¸Ñ Ð¿Ð¾ÐºÐ°Ð·Ð°Ð½Ð¸Ð¹ ÑиÑка в доÑожном ÑÑÑоиÑелÑÑÑве. Ðа пÑимеÑе ÑиÑка налиÑÐ¸Ñ Ð¾Ñибок в пÑоекÑнÑÑ ÑеÑениÑÑ Ð¿Ð¾ÐºÐ°Ð·Ð°Ð½ пÑинÑип ÑабоÑÑ ÑазÑабоÑанной модели. ÐÑÐµÐ´Ð»Ð¾Ð¶ÐµÐ½Ñ ÑпоÑÐ¾Ð±Ñ Ð¿ÑивлеÑÐµÐ½Ð¸Ñ Ð¸Ð½Ð²ÐµÑÑиÑий и ÑÐ½Ð¸Ð¶ÐµÐ½Ð¸Ñ Ð¸Ð½Ð²ÐµÑÑиÑионнÑÑ ÑиÑков в доÑожном ÑÑÑоиÑелÑÑÑве.<br />The work is devoted to the development of a model for managing investment and construction risks in road construction to improve the efficiency of projects. The purpose of the research is to study and develop methodical aspects and mechanisms of project management in road construction to minimize risks at the construction stage. The object of the research is an investment and construction project in road construction, the subject is methodical aspects of risk-based management. The following tasks were being performed during the work: 1. Analysis of the inherent risks in investment and construction projects at different stages of the project life cycle. 2. Analysis and synthesis of existing methods of investment risk management in road construction. 3. Defining the key points of qualitative and quantitative analysis methods. 4. Proposal of a methodology for investment risks assessment in road construction. 5. Development of a model for the investment volumes distribution by activities to reduce the level of risk in road construction. As a result of the master's thesis, there is an analysis of theory and practice of risk management in motor road design, construction and operation and there is a proposal of a methodology for investment risks assessment in road construction. There is a model developed for the investment volumes distribution by activities to reduce the level of risk in road construction. The operating principle of the developed model is shown on the example of the risk of errors in design decisions. Ways to attract investment and reduce investment risks in road construction are proposed.
Details
- Language :
- Russian
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........c39c9935fd03aeafe88e054cdb8860be
- Full Text :
- https://doi.org/10.18720/spbpu/3/2020/vr/vr20-5778