Back to Search
Start Over
Present Status of the Compact ERL at KEK
- Publication Year :
- 2014
- Publisher :
- JACoW, Geneva, Switzerland, 2014.
-
Abstract
- The Compact Energy Recovery Linac (cERL) project is ongoing at KEK in order to demonstrate excellent ERL performance as a future light source. The cERL injector was already constructed with its diagnostic beamline and successfully commissioned from April to June in 2013. In the next step, the cERL recirculation loop with a main superconducting linac and merger and dump sections has been constructed and its commissioning is scheduled to start in December 2013. Significant progress is expected by the IPAC14 conference date. In this presentation, we will describe the present status of the cERL including future developments.<br />Proceedings of the 5th Int. Particle Accelerator Conf., IPAC2014, Dresden, Germany
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........c34ed15a4fa5425672b6e6b6bc3fadb1
- Full Text :
- https://doi.org/10.18429/jacow-ipac2014-mopro110