Back to Search
Start Over
Unit Commitment Model under Uncertainty of Wind Power Producer
- Source :
- Iranian Journal of Science and Technology, Transactions of Electrical Engineering. 45:1295-1309
- Publication Year :
- 2021
- Publisher :
- Springer Science and Business Media LLC, 2021.
-
Abstract
- Recently, the increasing penetration of wind energy has provided various ways to operate the system at low cost and low pollution. On the other hand, the noticeable uncertainties caused by the forecast error of wind speed restrict the utilization of wind energy. Moreover, it brings unprecedented challenges to maintain system adequacy. One prevailing solution is to maintain sufficient spinning reserve of thermal units, which is not affordable. This paper analyses the relationship between the operation cost and wind power uncertainty using AC unit commitment in the frame of a short-term market. Conditional value-at-risk is established in a percentage of the worst-case estimations on wind power scenario under uncertainty to achieve adequate trade-offs between optimal solution and risk aversion. Operation cost of generation, load shedding cost and reserve cost are optimally established by multi-objective optimization. Finally, the simulation is performed on the test system and the obtained results are evaluated and compared to demonstrate the research effectiveness.
- Subjects :
- Wind power
Forecast error
Computer Networks and Communications
Risk aversion
Computer science
business.industry
Frame (networking)
Load Shedding
Energy Engineering and Power Technology
Wind speed
Reliability engineering
Power system simulation
restrict
Signal Processing
Computer Vision and Pattern Recognition
Electrical and Electronic Engineering
business
Subjects
Details
- ISSN :
- 23641827 and 22286179
- Volume :
- 45
- Database :
- OpenAIRE
- Journal :
- Iranian Journal of Science and Technology, Transactions of Electrical Engineering
- Accession number :
- edsair.doi...........ade5b0ba81d6fb0c79cefe2a4636dace