Joint Analysis of the Power Generation Construction Project Schedule, Cost and Quality Based on DEA

Authors :
Yan Yan Wang
Hong Fei Sun
Lan Ping Zhou
Source :
Applied Mechanics and Materials. 467:282-286
Publication Year :
2013
Publisher :
Trans Tech Publications, Ltd., 2013.

Abstract

As economic globalization and information technology integration, it brings a great deal of changes and challenges to enterprise business and management. This research is aimed at establish a reasonable configurations among schedule, cost and quality of power construction projects in China and draw up a standardization process to enterprise management. According to a detailed joint analysis of the process efficiency and resource matching condition with Date Envelopment Analysis (DEA) method, we formulate two models including CCR and BBC. Then we select 12 power construction projects as samples, give a data verification, and find a correlation among schedule, cost, quality and project achievement. At the end of paper, we give an objective evaluation to it, and analysis the shortcomings and insufficiency of this research.

Details

ISSN :
16627482
Volume :
467
Database :
OpenAIRE
Journal :
Applied Mechanics and Materials
Accession number :
edsair.doi...........a05be3b010918d427412ecd237c31861
Full Text :
https://doi.org/10.4028/www.scientific.net/amm.467.282