Back to Search
Start Over
SRP 69 kV Subtransmission Line Reconductoring Project, Draft Environmental Assessment
- Publication Year :
- 2002
- Publisher :
- Environmental Services Group, ENTRANCO, Inc., 2002.
-
Abstract
- This Environmental Assessment (EA) has been prepared to evaluate Salt River Project (SRP) proposed plans to perform major maintenance to two 69 kilovolt (kV) subtransmission lines within an SRP power line utility corridor easement. Although this project is not a Federal undertaking or action, this EA has been prepared in accordance with the guidelines contained in the Bureau of Indian Affairs (BIA) Manual Release No. 9303, NEPA Handbook, September 24, 1993. The manual provides guidance for complying with the National Environmental Policy Act (NEPA) and its implementing regulations, [Title 40 of the Code of Federal Regulations (40 CFR) Parts 1500-1508]. The purpose of this EA is to evaluate the potential social, economic and environmental impacts that may occur from the project and to identify measures that will effectively mitigate potential adverse impacts. The goal of this document is to assist decisionmakers in making informed decisions about the project.
- Subjects :
- Historic
Salt River Valley Drainage Basin
Domestic Structure or Architectural Complex
McDowell Mountain
Artifact Scatter
Domestic Structures
Archaeological Overview
AZ U:6:61 (ASM)
SR 87
Agricultural or Herding
Gilbert Road
AZ U:6:266 (ASM)
AZ U:5:62 (ASM)
Room Block / Compound / Pueblo
Archaeological Feature
Resource Extraction / Production / Transportation Structure or Features
Arizona
Water Control Feature
Hohokam
Settlements
Encampment
Reconnaissance / Survey
Sawik Mountain
Ground Stone
Beeline Dragway
Maricopa
Indian School Road
Environment Research
AZ U:5:61 (ASM)
Arizona Canal
Apache Peak
Scottsdale
Subjects
Details
- Language :
- English
- Database :
- OpenAIRE
- Accession number :
- edsair.doi...........9e10d35aa933b01b021c3bf57caa397d
- Full Text :
- https://doi.org/10.6067/xcv8426146