Cite
Optimizing the Connection of a new 360 Mgd Headworks Facility to Live Incoming Sewer Trunk Lines and the Primary Treatment Process
MLA
Mike Bock, and Trimbak Vohra. “Optimizing the Connection of a New 360 Mgd Headworks Facility to Live Incoming Sewer Trunk Lines and the Primary Treatment Process.” Proceedings of the Water Environment Federation, vol. 2012, Jan. 2012, pp. 6031–49. EBSCOhost, https://doi.org/10.2175/193864712811709968.
APA
Mike Bock, & Trimbak Vohra. (2012). Optimizing the Connection of a new 360 Mgd Headworks Facility to Live Incoming Sewer Trunk Lines and the Primary Treatment Process. Proceedings of the Water Environment Federation, 2012, 6031–6049. https://doi.org/10.2175/193864712811709968
Chicago
Mike Bock, and Trimbak Vohra. 2012. “Optimizing the Connection of a New 360 Mgd Headworks Facility to Live Incoming Sewer Trunk Lines and the Primary Treatment Process.” Proceedings of the Water Environment Federation 2012 (January): 6031–49. doi:10.2175/193864712811709968.