Back to Search Start Over

Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

Authors :
K.G. Burgard
Publication Year :
1998
Publisher :
Office of Scientific and Technical Information (OSTI), 1998.

Abstract

This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.

Details

Database :
OpenAIRE
Accession number :
edsair.doi...........97984195266e4e02456da055359a6dca
Full Text :
https://doi.org/10.2172/362489