Back to Search Start Over

Fabrication of ICHIRO nine-cell cavities in PAL for STF of KEK

Authors :
M.S. Hong
I.S. Park
J.Y. Hung
S.S. Song
In Soo Ko
D.T. Kim
S.U. Kim
Y.C. Kim
Y.U. Sohn
S.H. Kim
Wooseup Hwang
H.C. Kwon
J.H. Choi
C.W. Chung
Source :
2007 IEEE Particle Accelerator Conference (PAC).
Publication Year :
2007
Publisher :
IEEE, 2007.

Abstract

Pohang Accelerator Laboratory, POSTECH have studied SRF cavity and constructed SRF test laboratory from January 2006. The first activity for SRF research was to develop SRF 3rd harmonic cavity for PLS, which cavity was done in 2006 and the cryostat are under design. The fabrication of ICHIRO cavity, which is ILC ACD cavity, is PAL's second activity related to SRF. Deep drawing, trimming and welding by electron beam for a 9-cell ICHIRO cavity were done in PAL. The polishing processes of RF surface including electro-polishing were done in KEK with collaboration. This will be tested with real beam in STF-1 of KEK in second half period of 2007. This paper reports fabrication of ICHIRO nine-cell cavities in PAL.

Details

Database :
OpenAIRE
Journal :
2007 IEEE Particle Accelerator Conference (PAC)
Accession number :
edsair.doi...........914f46830101a2d48d8048ccc5054d70
Full Text :
https://doi.org/10.1109/pac.2007.4441187