Back to Search Start Over

Simulated Annealing and Scheduling in Manufacturing Systems

Authors :
Gérard Fleury
Source :
Operations Research ’91 ISBN: 9783790806083
Publication Year :
1992
Publisher :
Physica-Verlag HD, 1992.

Abstract

For scheduling in manufacturing systems, the make-span, or total flow time, is the difference between the output date of the last job on the last machine, and the input date of the first job on the first machine. The problem is to find a schedule which minimises the make-span.

Details

ISBN :
978-3-7908-0608-3
ISBNs :
9783790806083
Database :
OpenAIRE
Journal :
Operations Research ’91 ISBN: 9783790806083
Accession number :
edsair.doi...........8132eaf14894be02faf99ccb051e75c0
Full Text :
https://doi.org/10.1007/978-3-642-48417-9_68