Dry-or-buy decision support for dry kiln scheduling in furniture production

Authors :
Arman R. Yaghubian
Thom J. Hodgson
Jeffrey A. Joines
Source :
IIE Transactions. 33:131-136
Publication Year :
2001
Publisher :
Informa UK Limited, 2001.

Abstract

In this paper, a dry-or-buy cost model for a dry kiln scheduling problem in the furniture manufacturing industry is considered. Factory-specified due-dates for jobs, kiln availability, kiln capacity, and drying and buying costs are incorporated into an Integer-Programming (IP) model. As it may be difficult (i.e., because of due-dates, kiln availability, processing times, etc.) to meet all the due-dates, certain jobs may have to be out-sourced. The objective of the model is to minimize the total drying and buying costs while satisfying all due-dates. Because of the computational complexity of the problem, a heuristic approach is developed. Computational experience indicates that the heuristic gives high quality solutions with significant savings in time over standard IP algorithms.

Details

ISSN :
15458830 and 0740817X
Volume :
33
Database :
OpenAIRE
Journal :
IIE Transactions
Accession number :
edsair.doi...........7a2f4dca3056261fddbdc25c098109aa