Back to Search Start Over

Effect of process learning on manufacturing schedules

Authors :
Eleni Pratsini
Jeffrey D. Camm
Amitabh S. Ratur
Source :
Computers & Operations Research. 20:15-24
Publication Year :
1993
Publisher :
Elsevier BV, 1993.

Abstract

The capacity constrained lot sizing problem with learning is modeled as a nonlinear mixed integer program. Three solution techniques for solving the model are investigated. A nonlinear programming package together with the branch and bound technique is used to obtain a solution to the exact problem. The issue of nonconvexity is discussed. In the piecewise linearization of the learning curve, the problem is represented by a mixed integer programming model. Finally, a heuristic that gives near optimal solutions in minimal computer time is developed. Process learning results in a reduction in the number of setups and an increase in inventory level.

Details

ISSN :
03050548
Volume :
20
Database :
OpenAIRE
Journal :
Computers & Operations Research
Accession number :
edsair.doi...........78affac2b3441484b8657212f9388ce8
Full Text :
https://doi.org/10.1016/0305-0548(93)90092-w