Back to Search
Start Over
Enhancing Reservoir Management by the Successful Drilling and Installation of a Dual Lateral Completion
- Source :
- Day 1 Mon, November 09, 2020.
- Publication Year :
- 2020
- Publisher :
- SPE, 2020.
-
Abstract
- The challenges of high heterogeneous multi-layer reservoirs were a driver for ADNOC to establish new well completion requirements. Based on this, the well completion strategy was revised in order to improve the completion design for a Dual Oil Producer (DOP) initially well planned without accessibility into the upper drain. The solution was successfully implemented by drilling the well having a Multilateral Dual String Level 5 Completion System to have full reservoir isolation and mechanical accessibility to TD in both drains.A major approach was implemented giving the utmost importance to all operational risks concerning drilling and completion. The design relies on the Latch Coupling (LC) pre-installed with the production casing as the foundation for the successful drilling and cementing the upper drain liner and for different completion runs. Thus, a level 5 multi-lateral completion coupled with Inflow Control Devices and Pre-perforated Liner in the upper and lower lateral respectively was successfully deployed.The main advantages of this technology compared to the initial proposal are:Brings effectively two single wells from one slot of the wellhead tower as it provides independent access & control for enhanced reservoir management (well stimulation, production logging and water shut-off). Substantial cost savings due to the utilization of one slot only. Conventional single designs need two slots to deliver equivalent completion requirements. The completion technology meets the Well Integrity Policy & Completion Guidelines stated by ADNOC to have full accessibility to all drains.This is the first Level 5 configuration installed in UAE integrated with a lower completion. The design enhances the benefits of the multilateral construction by providing full mechanical & pressure isolation at the junction throughout the life of the well. Furthermore, accessibility to both laterals from surface without the use of a re-entry deflector or any constraints was deemed to be paramount for a successful well construction.
Details
- Database :
- OpenAIRE
- Journal :
- Day 1 Mon, November 09, 2020
- Accession number :
- edsair.doi...........6ac7333cd3ad755c3476a653a2c0569b
- Full Text :
- https://doi.org/10.2118/202861-ms