Back to Search
Start Over
Bates Linac Operational Experience
- Source :
- IEEE Transactions on Nuclear Science. 22:1341-1342
- Publication Year :
- 1975
- Publisher :
- Institute of Electrical and Electronics Engineers (IEEE), 1975.
-
Abstract
- Accelerator operation during the first year of scheduled beam to physics experiments is described. Some details of the gun, RF, water, vacuum, control and monitoring systems are reviewed with reference to performance and reliability.
Details
- ISSN :
- 00189499
- Volume :
- 22
- Database :
- OpenAIRE
- Journal :
- IEEE Transactions on Nuclear Science
- Accession number :
- edsair.doi...........65a76b94aada67e5ba32b886bfa6d7cd
- Full Text :
- https://doi.org/10.1109/tns.1975.4327882