Back to Search Start Over

Status and recent results of the BAIKAL-GVD project

Authors :
V.B. Brudanin
I. A. Danilchenko
R. R. Mirgazov
D.Yu. Bogorodsky
A. V. Skurikhin
A.A. Smagina
A. A. Doroshenko
A. A. Perevalov
Zh.-A.M. Dzhilkibaev
A.D. Avrorin
K. V. Konishchev
I. A. Belolaptikov
Konstantin Kebkal
G.V. Domogatsky
T. I. Gress
N. M. Budnev
E. A. Osipova
E.N. Pliskovsky
A.A. Sheifler
Zdenek Hons
A. I. Panfilov
D.A. Kuleshov
A.P. Koshechkin
O.G. Kebkal
E. N. Konstantinov
Valery Zurbanov
V. Yu. Rubtsov
M.I. Rozanov
F.K. Koshel
Aleksandr Gafarov
R. Bannasch
S.V. Fialkovsky
A. V. Zagorodnikov
A.V. Korobchenko
V. M. Aynutdinov
V. A. Zhukov
Sergey Yakovlev
B.A. Shaybonov
V.F. Kulepov
A. N. Dyachok
Olga Suvorova
L. V. Pankov
V. A. Kozhin
M.B. Milenin
O. N. Gaponenko
Evgenii V Rjabov
B. A. Tarashchansky
V.I. Ljashuk
A.V. Avrorin
K.V. Golubkov
V.A. Poleshuk
Source :
Physics of Particles and Nuclei. 46:211-221
Publication Year :
2015
Publisher :
Pleiades Publishing Ltd, 2015.

Abstract

The Prototyping phase of the BAIKAL-GVD project has been started in April 2011 with the deployment of first autonomous engineering array which comprises all basic elements and systems of the Gigaton Volume Detector (GVD) in Lake Baikal. The prototyping phase will be concluded with deployment of the GVD demonstration cluster “DUBNA” in 2015, which will comprise 192 light sensors arranged at 8 strings. The first stage of the GVD demonstration cluster which consists of three strings was deployed in April 2013 and successfully operated up to February 2014. We review the prototyping phase of the BAIKAL-GVD project and describe the configuration and design of the 2013 engineering array.

Details

ISSN :
15318559 and 10637796
Volume :
46
Database :
OpenAIRE
Journal :
Physics of Particles and Nuclei
Accession number :
edsair.doi...........60c6b1b444c1c935ef1296b77cd5bba7
Full Text :
https://doi.org/10.1134/s1063779615020033