Cite
Application of Pre-Grouting Technique in Yellow River Crossing Tunnel in Eastern Route of South to North Water Transfer Project
MLA
Hao Liang Wang, et al. “Application of Pre-Grouting Technique in Yellow River Crossing Tunnel in Eastern Route of South to North Water Transfer Project.” Advanced Materials Research, Jan. 2012, pp. 1133–36. EBSCOhost, https://doi.org/10.4028/www.scientific.net/amr.430-432.1133.
APA
Hao Liang Wang, Shi Wei Duan, Xiao Yan Wang, & Xian E Xu. (2012). Application of Pre-Grouting Technique in Yellow River Crossing Tunnel in Eastern Route of South to North Water Transfer Project. Advanced Materials Research, 1133–1136. https://doi.org/10.4028/www.scientific.net/amr.430-432.1133
Chicago
Hao Liang Wang, Shi Wei Duan, Xiao Yan Wang, and Xian E Xu. 2012. “Application of Pre-Grouting Technique in Yellow River Crossing Tunnel in Eastern Route of South to North Water Transfer Project.” Advanced Materials Research, January, 1133–36. doi:10.4028/www.scientific.net/amr.430-432.1133.