Back to Search Start Over

Testing the World’s Largest Gas Turbines

Authors :
Thomas P. Callahan
Carl R. Bugg
Ronald A. DuBose
Source :
Volume 3: Heat Transfer; Electric Power; Industrial and Cogeneration.
Publication Year :
2001
Publisher :
American Society of Mechanical Engineers, 2001.

Abstract

Emprise Corporation designed and managed construction for a new state-of-the-art facility (Test Stand 8) and for a radical upgrade and renovation of a circa 1972 test facility (Test Stand 3). General Electric will use Test Stand 8 for prototype 9H (50 Hz) gas turbine testing, and will use Test Stand 3 for 7F (60 Hz) gas turbine testing. This paper summarizes the unique challenges and innovative solutions that were required for these projects.Copyright © 2001 by ASME

Details

Database :
OpenAIRE
Journal :
Volume 3: Heat Transfer; Electric Power; Industrial and Cogeneration
Accession number :
edsair.doi...........5fe6977e3e9e79483b53d161d1391529