Back to Search
Start Over
The concept design of a transfer line from the recycler to the main injector for the fermilab nova project
- Source :
- 2007 IEEE Particle Accelerator Conference (PAC).
- Publication Year :
- 2007
- Publisher :
- IEEE, 2007.
-
Abstract
- Upon the termination of the Fermilab Collider program, the current Recycler anti-proton storage ring will be converted to a proton pre-injector for the Main Injector synchrotron. This is scheduled to increase the beam power for the 120 GeV Neutrino program to upwards of 700 KW. Due to momentum aperture requirements, a Recycler to Main Injector transport line will be constructed wholly within a horizontal dispersion free region in the 30 straight section. The concept design will be presented in this paper.
Details
- Database :
- OpenAIRE
- Journal :
- 2007 IEEE Particle Accelerator Conference (PAC)
- Accession number :
- edsair.doi...........598da978c0822c4d935e2eaf0ab7df5d
- Full Text :
- https://doi.org/10.1109/pac.2007.4440879